A foundation settles over time. New houses too experience movement in their foundation. The million dollar question is - How to level a floor which sinks toward the center of a house? And how much of this can be done by homeowners? Following are 9 steps of House Releveling in Melbourne:
1. To begin with, consult a qualified Structural Engineer. The structure might not be as you expect and you might cause more trouble than you solve.
2. Measure and determine how far the middle of your house needs to be lifted.
3. When you are aware of the lowest portion of the center, mark that point.
4. Build a temporary post on firm level ground using concrete blocks or large blocks of wood. Alternate the placement of every layer of blocks by 90 degrees to enhance stability. This is one of the most important steps of House Releveling in Melbourne.
5. When the space above the temporary post is adequate to place a hydraulic jack and reach the structural member above, begin with jacking the house up. As the house moves up, add smaller blocks to support the center at the new elevation.
6. After the lowest point is lifted to the elevation of the next lowest point, remove the jack slowly, allowing the house to nestle on the temporary post.
7. Check for problems that might have been created by movement of the house. Sheetrock cracks might appear.
8.Construct one more temporary post and repeat the process.
9. House Releveling in Melbourne is incomplete without this last step. When the floor is level & stable on the temporary posts, prepare for permanent supports. Carefully check the bottom of the supports for rot or other trouble. If the bottom is no longer sinking, they can remain in place. Finally, by cutting the center supports shorter, a novel beam can be rested on top of the shortened posts to give support to the center of the house.
1. To begin with, consult a qualified Structural Engineer. The structure might not be as you expect and you might cause more trouble than you solve.
2. Measure and determine how far the middle of your house needs to be lifted.
3. When you are aware of the lowest portion of the center, mark that point.
4. Build a temporary post on firm level ground using concrete blocks or large blocks of wood. Alternate the placement of every layer of blocks by 90 degrees to enhance stability. This is one of the most important steps of House Releveling in Melbourne.
5. When the space above the temporary post is adequate to place a hydraulic jack and reach the structural member above, begin with jacking the house up. As the house moves up, add smaller blocks to support the center at the new elevation.
6. After the lowest point is lifted to the elevation of the next lowest point, remove the jack slowly, allowing the house to nestle on the temporary post.
7. Check for problems that might have been created by movement of the house. Sheetrock cracks might appear.
8.Construct one more temporary post and repeat the process.
9. House Releveling in Melbourne is incomplete without this last step. When the floor is level & stable on the temporary posts, prepare for permanent supports. Carefully check the bottom of the supports for rot or other trouble. If the bottom is no longer sinking, they can remain in place. Finally, by cutting the center supports shorter, a novel beam can be rested on top of the shortened posts to give support to the center of the house.